The main boiler lid can adopt lifting system, it is easy to clean and the cleaning effect is more obvious, the main boiler can adopt tilting discharge. The boiler body is welded with 3 layer imported SS plate, tank body and pipes adopts mirror polish which meet the GMP standard.